Loading Events

Pre-Tour with K&M Technology Group Webcast

October 16 @ 9:00 am - 10:00 am

Our team of engineers will be going live on both LinkedIn Live & YouTube to discuss how the production hole in most Gulf of Mexico wells represents a tiny fraction of the overall well footage; but what makes deploying these screens so complex?

 

Details:

Time: 9:00am CDT UTC -5

Date: Friday, October 16th

Basin: GOM (Mexico & US)

Title: Walking the Tightrope: “Installing completion screens in the Gulf of Mexico”

Event Summary: The production hole in most Gulf of Mexico wells represents a tiny fraction of the overall well footage; but what makes deploying these screens so complex?

Hosts:
Julio Palacio – Principal Drilling Engineer
Chris Cutts P.E. – General Manager

Other Sessions:

VIRTUAL 3-Day ERD and Complex Well Design and Execution Training- Americas (US Central Time)

November 2 - November 12

K&M Technology Group is excited to announce its virtual training offering. We have put a lot of effort into coming up with a format that is a good mix of being self-paced, interactive, and equipped for holding participants attention to ensure it is valuable time spent for everyone that chooses to attend our training. We […]

VIRTUAL 3-Day ERD and Complex Well Design and Execution Training- Europe & Africa (GMT)

November 23 - December 3

K&M Technology Group is excited to announce its virtual training offering. We have put a lot of effort into coming up with a format that is a good mix of being self-paced, interactive, and equipped for holding participants attention to ensure it is valuable time spent for everyone that chooses to attend our training. We […]

Questions? Contact Us

Scroll to Top