Challenge:
Poor drilling performance from slow ROP, Stuckpipe, wellbore instability and lost return
Solution:
• Offset well review and project audit
• Training based on audit finding
• Optimized well design
• Implement proper hole cleaning practices, connection and tripping practices
• Geomechanic solution
• Equipment recommendation
Results:
• 60% Reduction in well delivery time.
